Professional Borehole Drilling

Expert Borehole Drilling
27+ Years Experience Since 1997

From site survey to pump installation, Aquasolve delivers complete borehole solutions across Ghana. Our experienced team has drilled over 500 successful boreholes for homes, businesses, and industries.

πŸ“ž Call: 054 946 9787 Request Site Survey

Complete Turnkey Borehole Solutions

We don't just drill β€” we deliver reliable, sustainable water sources with guaranteed results.

01
πŸ”

Site Survey & Geophysical Assessment

Duration: 1-2 days

Professional hydrogeological survey using resistivity and electromagnetic methods to identify optimal drilling locations. We map underground water-bearing formations before drilling begins.

What We Do:

  • βœ“VLF electromagnetic survey
  • βœ“Electrical resistivity profiling
  • βœ“Geological formation mapping
  • βœ“Aquifer depth estimation
  • βœ“Water yield prediction
  • βœ“Site accessibility assessment
02
βš™οΈ

Borehole Drilling

Duration: 2-5 days

Professional drilling using rotary or DTH (Down-The-Hole) methods. Typical depths 30-150 meters depending on geology and water table depth. We drill until we hit productive aquifers.

What We Do:

  • βœ“Rotary drilling (mud/air)
  • βœ“DTH hammer drilling
  • βœ“Real-time depth logging
  • βœ“Formation sampling
  • βœ“Multiple aquifer penetration
  • βœ“Drilling to specified depth
03
πŸ”©

Casing & Screening

Duration: 1 day

Installation of high-quality PVC or steel casing to prevent collapse. Slotted screens installed at water-bearing zones to allow water entry while filtering out sand and gravel.

What We Do:

  • βœ“UPVC or GI casing
  • βœ“Slotted well screens
  • βœ“Gravel pack installation
  • βœ“Annular sealing
  • βœ“Casing centralizers
  • βœ“Sanitary seal at surface
04
πŸ’¨

Development & Cleaning

Duration: 1-2 days

Mechanical development using air-lift or surge methods to remove drilling fluids, fine particles, and improve borehole yield. Continued until water runs clear.

What We Do:

  • βœ“Air compressor development
  • βœ“Surge block development
  • βœ“High-pressure jetting
  • βœ“Removal of drilling mud
  • βœ“Aquifer stimulation
  • βœ“Yield optimization
05
πŸ“Š

Yield Testing & Analysis

Duration: 1 day + lab time

Comprehensive pump test to determine sustainable yield, drawdown, and recovery rates. Samples taken for water quality analysis.

What We Do:

  • βœ“Step drawdown test
  • βœ“Constant rate pumping test
  • βœ“Recovery test
  • βœ“Specific capacity calculation
  • βœ“Water quality sampling
  • βœ“Lab analysis coordination
06
⚑

Pump Selection & Installation

Duration: 2-3 days

Professional installation of submersible pump sized for actual yield and usage requirements. Complete electrical work, control panel, and commissioning.

What We Do:

  • βœ“Grundfos/Pedrollo pumps
  • βœ“Stainless steel rising main
  • βœ“Electrical control panel
  • βœ“Automatic level controller
  • βœ“Pressure switch/tank
  • βœ“Surface discharge plumbing

Complete Project: 7-14 Days

From initial site survey to handing over a fully functional water source. Timeline depends on depth, geology, and pump specifications.

Advanced Drilling Technology

Drilling Methods We Use

πŸ”„ Rotary Drilling (Mud/Air)

Primary method for most Ghana formations. Uses rotating drill bit with circulating drilling fluid (mud or air) to cut through rock and remove cuttings.

  • Best for: Soft to medium formations, depths 30-100m
  • Advantages: Faster drilling, good for unconsolidated formations
  • Formations: Clay, sand, weathered rock, soft sedimentary

πŸ”¨ DTH (Down-The-Hole) Hammer

Pneumatic hammer drill for hard rock formations. Hammer positioned at drill bit delivers powerful impact directly to rock face.

  • Best for: Hard rock, deep boreholes 80-150m+
  • Advantages: Penetrates granite, quartz, very hard formations
  • Formations: Granite, basalt, quartzite, hard metamorphic rock

Depth Capabilities

  • Shallow: 30-50m (typical for Accra coastal areas)
  • Medium: 50-100m (standard inland Ghana depths)
  • Deep: 100-150m+ (Volta Basin, Northern Region)

Our Track Record

500+
Boreholes Drilled
95%
Success Rate
27
Years Experience
10
Regions Covered

Led by Amosun Misbau, Technical Director with expertise in borehole drilling and civil engineering since 1997. Every project supervised by experienced professionals.